CV Picture
John Yeoman Pipefitter
0014087769021
johnyeoman@gmail.com
Energetic, sensible and independent worker with experience of plumbing and pipe fitting. I am an attentive worker with the will to follow the instructions till the end and deliver the best. I wish to work with different contractors on industrial projects to gain knowledge and improve the quality of my work.

Professional Experience

The Network Ltd.
Pipe Fitter
(Jun 2014 to Present) 10 Years & 6 Months

I work for the networking company that provides gas supply to industrial set ups.

I am in charge of working on different projects that include pipe cutting, fitting, insulation and testing of the supply.

I ensure that I remain in touch with all the project managers so that after fitting if there is any need of maintenance or replacement I do it on time.

Richard Constructions
Pipe Fitter
(Feb 2009 to May 2014) 5 Years & 3 Months

I worked on pressure pump fittings and replacing old pipes to move the water system underground.

My duties included cutting of pipes, taking measurements and fixing them in place with the help of holders and brackets.

I was also in charge of testing the water pressure and ensuing that all joints were leak proof.

Western Water Systems
Pipe Fitter
(Apr 2001 to Jan 2009) 7 Years & 9 Months

Joined the company as a trainee and then later became part of the team.

I was responsible for fitting pipes to provide water supply from the main line to the new houses being built in a colony. It required digging, welding, clustering of pipes and insulation as well.

I was appreciated for completing the job within the given time.

Technical Skills

  • Strength
    • 1.
    • 2.
    • 3.
    • 4.
    • 5.
    • 6.
    • 7.
    • 8.
  • Flexibility
    • 1.
    • 2.
    • 3.
    • 4.
    • 5.
    • 6.
    • 7.
    • 8.
  • Engineering
    • 1.
    • 2.
    • 3.
    • 4.
    • 5.
    • 6.
    • 7.
    • 8.
  • Metal Cutting
    • 1.
    • 2.
    • 3.
    • 4.
    • 5.
    • 6.
    • 7.
    • 8.
  • Pipe Fixing
    • 1.
    • 2.
    • 3.
    • 4.
    • 5.
    • 6.
    • 7.
    • 8.
  • Main Supply
    • 1.
    • 2.
    • 3.
    • 4.
    • 5.
    • 6.
    • 7.
    • 8.
  • Pressure Pump Installation
    • 1.
    • 2.
    • 3.
    • 4.
    • 5.
    • 6.
    • 7.
    • 8.
  • Gas Piping
    • 1.
    • 2.
    • 3.
    • 4.
    • 5.
    • 6.
    • 7.
    • 8.
  • Shunt and Bypass Creation
    • 1.
    • 2.
    • 3.
    • 4.
    • 5.
    • 6.
    • 7.
    • 8.
  • Installing Hangers and Brackets
    • 1.
    • 2.
    • 3.
    • 4.
    • 5.
    • 6.
    • 7.
    • 8.
  • Pipe Clustering
    • 1.
    • 2.
    • 3.
    • 4.
    • 5.
    • 6.
    • 7.
    • 8.
  • Holding
    • 1.
    • 2.
    • 3.
    • 4.
    • 5.
    • 6.
    • 7.
    • 8.

Personal Skills

Vocational Training

Pipe Fitting
Training
(Sep 1998 to May 2001)
Worked with a construction company to learn about pipe fitting and handling changes of pipes. I also learnt the process of providing supply pipelines from the main joint.
Plumbing
Training
(Feb 1996 to Jan 1998)
I worked with a water works company to learn the basics of plumbing and pipe line fittings.

Prominent Projects

Hydraulic System Installation
I installed new pipeline for the renewal of old valve system for the water supply at Mint Park Hotel. It was a freelance project and I worked with the contractor to install pipes and change the valves to work for the pressure pump that was fitted for water supply in the hotel.
Gas Pipelines
Installed the pipeline from the main supply to the houses in the new colony. It was a construction project that took more than a year to complete.

Personal

  • Nationality
    United States
  • D.O.B
    1980/07/15
  • Marital Status
    Married
  • Driving License
    Yes

Languages

English (US)
Native or Bilingual Proficiency

Activities & Interests